Production & BOM¶
Assemble finished goods from components using a bill of materials.
Bill of Materials (BOM)¶
Materials → Bill of Materials (/materials/bom) — define an assembly: a parent item plus
component lines with the quantity of each consumed per unit produced.
Screenshot: Bill of materials — TODO
Production¶
Materials → Production (/materials/production) — schedule a run against a BOM.
- New Order — choose the BOM/finished item and quantity.
- Post — the run issues the component raw materials and receives the finished goods into stock, all written to the stock ledger.
Stock must be available
Posting a production order consumes components from stock — make sure the inputs are on hand (and valued) first.